With today's computing power and storage capacity, the possibilities for geotechnical engineers are almost unlimited. CEMS combines engineering and software knowledge to develop MicroServices and custom made applications to automate the design process.
A pile design was made for the VDH Reijerwaard project in Barendrecht. The design includes the new construction of a warehouse with cold storages equipped with loading docks and a 2-storey office.
The reconstruction of the 'De Nieuwe Meer' junction is part of the Zuidasdok project, one of the largest infrastructural construction projects in the Netherlands.
The assignment was to design the sheet pile wall along the road N243; length of approx. 15.4 kilometers. CEMS helped to optimize the design using GEOLIB.
App to determine piping risk more accurately; A successful innovation!
The simplified design and analysis of Crane working platforms.
All monitoring data at a glance; having all the relevant measurement systems within one online portal is unique in its kind!
Automated Subsidence Forecasting based on Continuous Measurements
Geohydrological analysis requires data to reduce risks, analyse time is reduced by 50% to 75%.
In this project, CEMS was involved in the 2nd opinion of the dewatering plan for the construction of the 37 foundations for the onshore wind turbines.
The widening of the Södertälje Canal in Sweden was executed by means of anchored sheet pile walls on both sides of the canal.