Due to the green electricity produced by the wind turbines, this project makes a substantial contribution to the Energy Agreement of the province of Flevoland. The new outer dike wind turbines in the IJsselmeer are part of a larger initiative by SwifterwinT and Vattenfall: a wind farm on land and water in the municipalities of Dronten and Lelystad, where 74 wind turbines will be replaced by a total of 61 modern turbines with more power.
Characteristics
- 37 foundations
- Very extensive geotechnical survey 900 CPT/boreholes
- During execution higher iron content and flow rates than expected -> permit had to be extended
Added value of CEMS
- Uplift calculation of the excavation floor using UpliftCore
- 18 different excavation scenarios per foundation
- Optimised excavation level for each location
- 1 minute to generate the scenarios and figures for all locations
- within existing permit!
- most foundations executed without dewatering!
- expensive de-ironing installations reduced to half!


More information about the "Winplanblauw" project can be found at: windplanblauw.nl